Standard Description
Outfitted together with the zero leak bidirectional checking sole-noid valves, this energy unit is intended to the operation of two independent circuits. Which are respectively for that main and subordinate platforms of the double scissors lift. Two cut-off valves are made use of for reducing the machine manually in situation of energy loss. If extra independent circuits are demanded for the application please get hold of us for availability.
Remark: one. Please seek the advice of our revenue engineer for that different pump displacement, motor electrical power or tank capability.
2. CSA or UL licensed motors can be found upon request.
Exclusive Notes
1. The AC motor is of S3 duty cycle, which could only do the job intermittently and repeatedly, i.e., 1minute on and 9 minutes off.
2. Clean the many hydraulic components concerned in advance of installation of the power unit.
three. Viscosity of the oil shoud be 15~46 cst,along with the oil must be clean and free of charge of impurities,N46 hydraulic oil is advisable.
four. The power unit need to be mounted vertically.
5. Check the oil degree in the tank just after the preliminary operating of the energy unit.
six. Oil shifting is needed following the preliminary one hundred operation hours,afterwards when just about every 3000 hours.

TAGs:

Tractor Shaft

As one of the tractor shaft manufacturers, suppliers, and exporters of mechanical products, We offer tractor shafts and many other products.

Please get in touch with us for details.

Manufacturer supplier exporter of tractor shaft.